Management Philosophy
Sangjin History
Subsidiary
Certificates
|
|
|
Sangjin History |
Home > About SANGJIN > Sangjin History |
|
|
|
 |
|
 |
Dec 2013
Nov 2013
Aug 2012 |
Built an extension of the fourth Qingdao Sangjin (1,300㎡)
Appointed CEO JUNG, SEUNG DON
Built an extension of the third Qingdao Sangjin (4,900㎡) |
|
|
|
 |
July 2000
Oct 2002
May 2003
Aug 2004
April 2005
Oct 2006
Oct 2008
|
Established the third factory, Sangjin Development Shihwa Branch – manufacturing soundproof wall and guardrail (16,500㎡)
Established Qingdao Sangjin Metal Product Limited – Qingdao, China (33,950㎡)
Started operation of new manufacturing line of temporary soundproof wall (steel, plastic)
Started operation of the first Steel Grating manufacturing facilities in Qingdao Sangjin (GW2)
Started operation of the second Steel Grating manufacturing facilities in Qingdao Sangjin (GW2)
Started operation of Hot Dip Galvanizing facilities in Qingdao Sangjin (2x6,1x2.4)
Started operation of Slitting Machine facilities in Qingdao Sangjin |
|
|
|
 |
Dec 1990
Oct 1991
Jan 1996 |
Started operation of the third Hot Dip Galvanizing facilities (15x10.5x2.1)
Started operation of the fifth Steel Grating manufacturing facilities (GW2)
Established the second factory, Cheonan Factory (82,600㎡) |
|
|
|
 |
June 1984
April 1986
Oct 1986
July 1988
Aug 1988
Jan 1989
April 1989 |
Achieved the Export-Import License (Seoul City)
Started operation of the first factory in Banwol Industrial Complex (13,500㎡)
Started operation of the second Steel Grating manufacturing facilities (GW1)
Started operation of the first Hot Dip Galvanizing facilities (2x6.3x2.4)
Started operation of the third Steel Grating manufacturing facilities (GW1)
Started operation of the fourth Steel Grating manufacturing facilities (GW2)
Started operation of the second Hot Dip Galvanizing facilities (1.8x7.2x2.4) |
|
|
|
 |
1969
1970
July 1977
~May 1979
Oct 1979 |
Established Sangjin Development
Converse Sangjin Development to corporation
Installed the fifth, sixth, seventh boiler and auxiliary equipments in Thermal Power Plant in Doha, Kuwait
Started operation of the first Steel Grating manufacturing facilities (GW1) |
|
|
|
|